No Frills Grocery Store

Completed in June 2014, this grocery store is the first of its kind in the lower mainland. High end flooring, interior wood panelling and meticulous landscaping and exterior facade work to set this store's curb appeal apart. The project delivery method was fixed price and was completed on schedule.

Asian Greens Processing Facility

This 18,000 SF space was fit up with cooler, freezer and processing spaces with insulated metal panels, concrete curbs & epoxy. The multi-temperature rooms were constructed using box in a box construction methodology in an existing facility. An addition to the existing office was also completed.

Glacier Pro completed construction of this space 8 days ahead of schedule.

B&B Contracting Ltd. - head offices, South Surrey

This facility consisted of 20,000 SF of maintenance shop area with an 18,000 SF high end office space. Exterior structure was built using concrete tilt up with large spans of curtain wall to lend a dynamic curb appeal to the Campbell Heights Area. This project was completed on time, and substantially under budget.

“Glacier Pro has been providing construction management, design coordination & permit coordination services on our brand new head office and maintenance shop in Campbell Heights, South Surrey. They are a detail oriented & efficient group, and have helped to bring in our building on time and under budget.

"I would recommend Glacier Pro for similar projects in the lower mainland."
-- Kelly Bickerton, B&B Contracting Ltd.

Cloverdale Cold Storage 3 – 3188 – 188th Street

Approximately 100,000 SF of freezer area completed in less than 5 months! Through rigorous schedule control, this project was completed on time and on budget.

Golden Valley Foods – 3841 Vanderpol Court

Completed in June 2011, this 75,000 SF facility consists of processing and storage areas with office space and a fully landscaped yard.

Klondike Cold Storage – 5775 – 272nd Street

Completed in January 2011, this freezer facility consists of 80,000 SF of building area with over 10,000 pallet spaces of freezer storage space. The building also includes a 10 bay loading dock and 3 large blast freezers.

Cloverdale Cold Storage – 3023 – 188th Street

Completed in September 2009, this 130,000 SF facility consists of multi temperature storage areas and office area. This project was constructed to LEED silver standards and Glacier Pro continues to do ongoing fit-up work at this facility.

South Surrey BC Perishables Distribution Center – 2755 – 190 Street

Completed in September 2009, this 422,000 SF facility is a multi-temperature distribution center. Q&A and office area. This project was credited by Loblaws management for being completed on time, under budget and meeting LEED Silver requirements for construction. Glacier Pro provides ongoing maintenance service at this facility.

Cold Logic Banana Rooms

Four Banana Rooms constructed within an existing facility during regular business hours without any interruptions to facility operations. Project delivery method was design / build and rooms were delivered on time and on budget.

Versacold Delta Shipping Office Renovations

Extension to existing mezzanine to enable construction of new printer & data room & shipping office layout revisions. Washrooms & locker rooms reconfigured to suit changing facility requirements. Works were completed during off hours & weekend.